Project Profile

  Essential Logistics

The wind farm site is remote and presents a significant logistics challenge. Wind turbines and their propeller blades are large pieces of equipment that need special handling. LTWP commissioned Mammoet to conduct a route survey in Kenya to assess the state of the existing infrastructure and to determine the investments required to transport the turbines, equipment and materials to the site.

The study determined that some 200 km of road needed to be upgraded, and several bridges strengthened in order to transport the wind turbines to the site from the port in Mombasa. These costs are included in the financial model.
More on Project Profile
» Essential Logistics
» Connecting to the National Grid
» Environmental Impact
» The Renewable Energy Resource


Copyright ©2010 Lake Turkana Wind Power Limited. All right reserved 
Capitol Hill Towers, 5th floor left wing, Nairobi, Kenya. Email: info@laketurkanawindpower.com 
Phone: +254 020 2726868/2726901 / +254 722 513567 / +254 722 707791:: P.O. Box 63716 -00619 Nairobi, Kenya ::Fax +254 (20) 2718349