Forecast power generated by the wind farm connects to the existing Kenya national grid. A comprehensive and detailed survey of the Kenyan electricity and high tension grid network by Schicon bvba, in consultation with the Kenya Power and Lighting Company (KPLC) and the Kenya Ministry of Energy, determined that 400 km of transmission lines are needed to connect to the national grid at the optimal point. Forecast completion of connection to the national grid is by June 2010. The KPLC has confirmed its interest to enter into a power purchase agreement with LTWP.